COBI TOWER 1                                                      COBI TOWER 2

   Overall GFA
  • 16,659 sqm
  • 30,314 sqm
   Total Net Leasable Area
  • 8,348 sqm
  • 17,961 sqm
   Number of Levels
  • 20 Storey
  • 17 Storey
   Building Management
  • Building Management System (BMS)
  • Building Management System (BMS)
   Backup Power
  • 100% of the building for 24 hours
  • 100% of the building for 24 hours
   Air Conditioning
  • Water-cooled chillers,
    Air conditioning capacity inside premises : 199 W/m2
  • Water-cooled chillers,
    Air conditioning capacity inside premises : 185 W/m2
   Lifts
  • 4 Lifts – Schindler including
    Passenger Lift: 3 high-speed lifts with 2.5m/s
    No. of Stops is 21/21 from Basement 2 to Level 19,
    Fire/ Service Lift: 1 high-speed lifts with 2.5m/s
    No. of Stops is 21/21 from Basement 2 to Level 19
  • 6 Lifts – Schindler including
    Passenger Lift: 5 high-speed lifts with 2.5m/s
    No. of Stops is 18/18 from Basement 2 to Level 16,
    Fire/ Service Lift: 1 high-speed lifts with 2.5m/s
    No. of Stops is 18/18 from Basement 2 to Level 16
   Illumination
  • 545 Lx (International Grade A+ office standard)
  • 500 Lx (International Grade A+ office standard)
   Parking
  • 42 parking spaces for cars and 178 parking spaces
    for motorbikes in the basements
  • 96 parking spaces for cars and 665 parking spaces
    for motorbikes in the basements
   For Air Conditioning System
  • Water-cooled chillers: 2 sets – 2×253 RT (2×890 kW)
  • Water-cooled chillers: 3×320 RT (3×1,125 kW)
   For Power Supply
  • 2 main line medium voltage feeders (22kV) from local
    power grid, 1×1,600 kVA dry type transformer in basement 1.
    1 stand-by generator with capacity of 1×1,400 kVA (Prime)
    each as backup for 100% of the building’s requirements.
  • 2 main line medium voltage feeders (22kV) from local
    power grid, 1×2,000 Kva & 1×1,250 kVA dry type transformer
    in basement 1.
    2 stand-by generator with capacity of 2×1,400 kVA (Prime)
    each as backup for 100% of the building’s requirements.